This project is made of three Water Container. Every Container is 82 meters long and 40 meters wide.
This project is used the rebar with EPOXY COATED.
The Hangzhou Bay Bridge – the world's longest bridge in 2010
Ballotta hydropower station in Pakistan
AFCAB
Rib Peeling Roll Stamping Thread Machine
EPD
Adjustable Rebar Coupler
Adding length Coupler-Rib Peeling Type
JB-2010 High-Power Rebar Upset Forging Parallel Threading Machine 12-40mm